Connection for micro-producers (production capacity up to 15 kW)
A micro-producer is an electricity producer with a production capacity of up to 15 kW, suitable for covering the electricity consumption of a household. In addition to consuming high quality electricity, the electricity produced can be sold to a suitable electricity seller.
Connection application with documentation
In order to receive an electricity producer's connection offer, a connection application must be submitted together with additional documents. This can be done via self-service or e-mail. To submit the application by e-mail, send the necessary documents and the completed form to the address [email protected].
The application can be easily and conveniently submitted in self-service
See the video guide for filling the application
Connection process
Submit a connection application
On the basis of the connection application, we will prepare a price offer within 30 days.
Signing a connection contract
We will sign a connection contract and begin the construction work required for the connection once the first instalment has been paid.
Commissioning small production equipment
To be able to start using your production equipment, send us a report on how the safety settings of the production equipment are set and a copy of the conformity audit report.
Signing a network contract
You need a network contract to be able to use the network connection.
Buying and selling electricity
To buy and sell electricity, you will have to sign an electricity contract with an electricity seller
How much does connection cost for a small producer?
The connection fee is determined during the preparation of the connection offer.
If the transmission capacity of the electricity network is not sufficient and needs to be increased, you will also have to pay for the necessary work and equipment and materials.
How long does connection take?
If no additional work needs to be done in the electricity network, then connection can take
up to 2 months
If additional work needs to be done in the electricity network, then connection can take
up to a year
What equipment is suitable?
See what equipment is compatible with our network.
If your selected equipment is not on our list, you should submit the
appropriate documents concerning the model.
Read more »
Steps to connection
We can use the connection application to prepare a quote.
To get a connection offer, submit an application in the self-service. On the basis of the connection application, we will prepare for you a connection offer that includes the expected price of connection.
Connection offers for electricity producers with a capacity of up to 15 kW are issued within 30 days.
We will sign a connection contract and begin the construction work required for the connection once the first instalment has been paid.
You have 60 days to review the connection offer. If you accept the terms we will start the construction work after the first instalment of the connection fee has been paid. The size of the first instalment is:
In order to be able to commission the power-generating module, please submit the following documents:
The production equipment may only be used once a new network contract has been concluded (parallel operation with the network and/or the supply of electricity to the grid is not allowed). In order to use the network connection, including transmission and metering of electricity, a network contract is required.
Once all the necessary documents have been submitted and invoices paid, sign the network contract.
You need a network contract to be able to use the network connection.
We will sign the network contract after you have submitted all the necessary documents and paid the bills. You need a network contract to be able to use the network connection, including to transmit electricity and measure its consumption.
To buy and sell electricity, you need to sign an electricity contract with an electricity seller. Details of electricity sellers can be found on our website.