Installing a meter
A meter has to be installed if you want to change the location of your meter, or want to replace a single-phase meter with a three-phase meter. It is also necessary if a new apartment has been added to an apartment building.
Installing a meter
A three-phase meter can be installed if the connection point in your apartment building has a three-phase network connection. If you want to switch from a single phase to three phases in a detached house, you have to request a transfer to three phases in order to replace the main fuse.
What should I do before a meter can be replaced?
Submit consent
Submit a written consent of the owner or manager of the building to replace the meter with a three-phase meter.
Organise the required work
Arrange the work outlined in the technical inspection document and in the design.
If required, submit a notice of conformity
Where the main fuse is over 80 A, you should order and submit to us notification that the electrical installation has been accepted into service along with a copy of the audit.
Installing the meters
We will install a new three-phase meter.
Changing the location of a meter
Arrange for the work to be done as outlined in the "Requirements for metering in apartment buildings (pdf)".
Work required if you want to change the location of your meter
Order a technical inspection document
A technical inspection document is required to change the location of a meter.
Organise the required work
Arrange the work outlined in the technical inspection document and in the design.
If required, submit a notice of conformity
Where the main fuse is over 80 A, you should order and submit to us notification that the electrical installation has been accepted into service along with a copy of the audit.
Installing the meters
After you have finished the preparation work we will install a new meter.
How much does it cost to install or replace a meter?
Installing or replaceing a meter
61.20 € *
Replacing a faulty meter is free of charge.
*A sealing fee will be added to the meter installation fee if the meter is sealed at a different time from when the meter is installed.
Forms and conditions
What should I do before a meter can be replaced?
Submit a written consent of the owner or manager of the building to replace the meter with a three-phase meter.
The work must be arranged as outlined in the standard technical inspection document and in the design, where a design is necessary. The qualified company you have chosen to do the electrical work will decide if a design is needed. You need not submit the design to us.
Some work has to be done in your meter before a three-phase meter can be installed, including:
The connecting party must prove the suitability of the electrical installation with an audit or letter of confirmation by the builder, according to the Device Safety Act.
After you have finished the preparation work we will install a new remotely read three-phase meter.
Work required if you want to change the location of your meter
Request a technical inspection document from us to change the location of a meter or build a new metering point. This will tell you if you have to get a reconstruction project for the internal electrical system.
The work must be arranged as outlined in the standard technical inspection documentand in the design, where a design is necessary.
Where the main fuse is over 80 A, you should order and submit to us notification that the electrical installation has been accepted into service along with a copy of the audit.
After you have finished the preparation work we will install a new remotely read meter.